Mount St Joseph

2023

The Process

Science Lab Refurbishment

Start

Science Lab Refurbishment

Rip out

Science Lab Refurbishment

First fix

Science Lab Refurbishment

Flooring

Science Lab Refurbishment

Furniture Fitting

Mount St Joseph High School – Science & Food Technology Refurbishment

At Mount St Joseph High School, we successfully completed the refurbishment of four science laboratories and one food technology room.

The project transformed what were once dark and dated classrooms into bright, modern, and inspiring learning environments designed to enhance both teaching and student engagement.

Each space was fitted with high quality, durable materials and modern finishes to create a functional yet welcoming atmosphere perfect for delivering practical science lessons and hands on food technology sessions.

The images below showcase the dramatic transformation and the exceptional results achieved.

Scope of Works

  • Complete strip out of existing fixtures & fittings

  • Building works consisting of blocking up doors

  • 1st & 2nd fix M&E, including heating

  • New non-slip flooring

  • New ceiling with integrated LED lighting

  • Hygienic cladding & decoration

  • New fixed furniture, stools, hobs & ovens

Science Lab Refurbishment
Science Lab Refurbishment
Science Lab Refurbishment
food technology refurbishment
Science Lab Refurbishment
Food Technology refurbishment
food technology refurbishment

2024


Mount St Joseph High School – Toilet & Kitchen Conversion

At the start of the year, Mount St Joseph High School asked us to transform an unused space previously an old lift shaft and storage room into a functional toilet and kitchen area for the staff and visitors using the conference room upstairs.

We worked closely with the school to make the most of the available space, creating a practical and modern facility that better serves the building’s users.

The result is a bright, accessible, and efficient space, turning what was previously underutilised into a valuable, functional area.

The photos below showcase the transformation and the positive impact of the renovation.


Mount St Joseph High School - Reception Refurbishment

As the summer term approached, the school asked us to carry out a full refurbishment of the main reception area. Our goal was to create a welcoming and functional space for staff, students, and visitors alike.

The project included:

  • A private workspace for the receptionist

  • A trophy wall to showcase the school’s achievements

  • New flooring throughout the area

  • Creation of a store cupboard

  • Installation of new fire doors to match the updated design

The result is a modern, open, and practical reception area, enhancing both the functionality and aesthetics of the school’s main entrance. The photos below highlight the transformation and the fresh, contemporary feel of the space.


Mount St Joseph High School - PE Changing & Shower Room Refurbishment

During the summer, the school requested a full refurbishment of the PE shower and changing facilities to improve hygiene, functionality, and durability.

The project included:

  • Complete strip out of existing fixtures and finishes

  • Full 1st fix M&E installations

  • Installation of new flooring and ceiling systems

  • 2nd fix installations to complete the space

  • Wall cladding in the changing rooms to create a cleaner, more hygienic surface, making it easier to maintain after use

The result is a modern, practical, and easy to clean PE facility, enhancing the student experience and ensuring the space meets current standards for hygiene and functionality.